The baseline design for schools guidance was developed by The Education Funding Agency (EFA) in response to a recommendation in the Review of Education Capital, in April 2011 which identified the requirement for a set of standardised drawings and specifications that could be used across a variety of educational institutes. The EFA is an executive agency, sponsored by the Department for Education (DFE).
The guidance documents are aimed at contractors, local authorities, school promoters and school building teams, along with other interested parties including governing bodies and leaders of schools. They are suitable for both primary and secondary schools.
They provide assistance with good practice design for the Priority School Building Programme (PSBP) and are detailed enough to enable environmental modelling and to establish building costs. The PSBP was established in 2011 to address the needs of those schools in the worst condition that required urgent repair. The programme is centrally managed and procured by the Education Funding Agency.
To deliver 'the maximum benefit for schools', the cost per square metre in the guidance has been reduced to £1113/m2 (excluding external works, fees and certain circumstances). The area has also been reduced, according to the guidance, 'without compromising the educational facility'. In secondary schools, teaching spaces and non-teaching areas are within the same minimum limits as before, but in primary schools the ICT room has been omitted, due to the widespread use of portable ICT equipment in classrooms.
There are a suite of designs available together with associated drawings and technical analyses:
- Baseline design: 105 place primary school with a 26 place nursery.
- Baseline design: 180 place primary school with a 26 place nursery.
- Baseline design: 210 place primary school with a 26 place nursery.
- Baseline design: 240 place primary school with a 26 place nursery.
- Baseline design: 600 place secondary school.
- Baseline design: 630 place primary school.
- Baseline design: 1,120 place primary school.
- Baseline design: 1,200 place secondary (practical specialism).
- Baseline design: 1,200 place secondary (academic specialism).
- Baseline design: finger-block 1,200 place secondary school.
- Baseline design: 1,200 place secondary (music and sports).
- Baseline design: superblock 1,200 place secondary school.
- Baseline design: 1,850 place secondary school.
[edit] Related articles on Designing Buildings Wiki.
- Building Bulletin 93: acoustic design of schools.
- Building Schools for the Future.
- Free schools.
- Priority School Building Programme.
- RIBA client adviser.
- Special educational needs: an analysis of the necessities for inclusion
[edit] External references
Featured articles and news
Notes of key roles and their differences.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.